Rumor has it that a legendary six—headed monster lurks in the deep waters of the Tyrrhenian Sea between Italy and the island of Sicily.____ (1)____ When completed in 2010,the world ’ s longest bridge will weigh nearly 300,000 tons—equivalent to the iceberg that sank the Titanic—and stretch 5 kilometers long.“That’s nearly 50 percent longer than any other bridge ever built,”says structural engineer Shane Rixon.
____(2) ____They’ re suspension bridges,massive structures built to span vast water channels or gorges.A suspension bridge needs just two towers to shoulder the structure’s mammoth weight,thanks to hefty supporting cables slung between the towers and anchored firmly in deep pools of cement at each end of the bridge.The Messina Strait Bridge will have two 54,100-ton towers,which will support most of the bridge’ s load.The beefy cables of the bridge.each 1.2 meter in diameter, will hold up the longest and widest bridge deck ever built.
When construction begins on the Messina Strait Bridge in 2005,the first job will be to erect two 370 meter-tall steel towers.____(3)____ Getting these cables up will be something.It ’ s not just their length—totally 5.3 kilometers—but their weight.____(4)____
After lowering vertical“ suspender ”cables from the main cables.builders will erect a 60 meter-wide 54.630-ton steel roadway, or deck——wide enough to accommodate 12 lanes of traffic.The deck’s weight will pull down on the cables with a force of 70,500 tons.In return,the cables yank up against their firmly rooted anchors with a force of 1 39.000 tons—equivalent to the weight of about 100,000 cars.Those anchors are essential.____(5)____
A. Some environmentalists are against the project on biological grounds.
B. What do the world’s longest bridges have in common?
C. If true,one day you might spy the beast while zipping(呼啸而过)across the Messina Strait Bridge.
D. They’re what will keep the bridge from going anywhere.
E. The second job will be to pull two sets of steel cables across the strait,each set being +a bundle of 44,352 individual steel wires.
F. They will tip up the scales at 166,500 tons—more than half the bridge’s total mass.
答案
1. C 2. B 3. E 4. F 5. D
【2016年职称英语考试卫生类模拟习题5】相关文章:
一年级描写妈妈的眼睛作文200字02-11
2022民生银行香港总行金融市场部招聘信息【3月20日24点截止报名】02-11
小学生100字国庆节游玩日记02-11
童年的乐土02-11
初级美语Lesson 66 Will It Leave on Time?02-11
江苏2013下半年银行从业资格考试报名入口:www.china-cba.net02-11
2025河北承德滦平县卫生健康局和滦平县医疗保障局所属事业单位选调医疗专业技术工作人员补充公告02-11
留学生活:德国留学生活费用详细解答02-11
