There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. Which of these statements is TRUE of system building?
A. It employs more men.
B. It is difficult and dangerous.
C. It can save both time and money.
D. It means less mechanization.
2. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. What lifts the concrete panels onto the building?
A. Cranes.
B. Man-power.
C. Pulleys.
D. Hydraulic jacks.
5. The usual fixed length in the modular system is_______.
A. twenty centimeters
B. ten millimeters
C. fifty centimeters
D. ten centimeters
参考答案:
1. C 2.A 3. B 4. A 5. D
本文来自 280文秘网(https://www.it280.com),转载请保留网址和出处
【2014年12月大学英语六级阅读理解强化模拟练习(1)】相关文章:
初一的元宵节英语日记02-10
2024年河南三门峡市渑池县义务教育阶段学校招生政策问答02-10
云南2025上半年中小学教师资格证笔试成绩查询入口已开通02-10
2023年安徽芜湖市公安局第二批次辅警招聘公告(9月28日9时开始报名)02-10
三年级数学日记300字大全:十位数的乘法02-10
《一棵树(节选)》阅读理解02-10
巴尔扎克的童年故事700字02-10
公卫医师传染病学辅导:霍乱控制措施02-10
2020年天津河北会计人员继续教育登录入口:天津市财政局02-10
23秒,32年——《唐山大地震》影评02-10